Spotlight
Nass the Group

Bahrain Horizontal Directional Drilling

Bahrain Horizontal Directional Drilling

Trenchless installation is preferred over the conventional open cut service installations in busy streets and major road crossings. There is no need to disrupt local residents and traffic or have a detrimental effect on beautiful landscapes and buildings.

Of course, with the help of suitable drilling equipment and experienced drilling crews with special training on the machines and installation products. It will also require the additional services to provide initial geological surveying, computer assisted network records and efficient advice on applications from engineers. Just the services Bahrain Horizontal Directional Drilling Co. can offer. The company endeavors to administer projects efficiently and cost effectively.

The Nass Group started directional drilling operations in September 2000 for the project 66KV Transmission Development.

BHDD has the right drilling equipment for all trenchless installations and have the required expertise. HDPE pipes up to maximum dia. of 355mm (od) can be installed in directional drilling method.