Durrat Al Bahrain - Bridges

Durrat Al Bahrain - Bridges

Project Description:

The Durrat Al Bahrain development works site is located at the southeast coast of Bahrain, directly south of the Sheikh Isa Air Base. The construction of thirteen concrete bridges on the prestigious 20km2 Durrat Al Bahrain Development, to provide general vehicular access between the individual islands within the overall development.

 

Scope of works:
Bahrain's greatest tourism landmark Durrat Al Bahrain has awarded Nass Contracting Co. the contract for construction of bridges comprising of 13 precast architectural bridges with a total length of 3.5 km. Six bridges to connect the Petals with the main Crescent and six others will connect the Petals with the Atolls. One bridge will connect with the hotel island. Const. of walkways, promenades between the island. The longest bridges are 520m, the shortest bridges 162m and the bridges to hotel 373m. the width of the bridges is 14.5m and the span of the bridges are 16.2m. These rest on piles of 1.2m diameter each.

Works at the bridges comprise of the following:
Filling for access requirements, bored and cast insitu reinforced piling, reinforced concrete pier beams and bridge substructures, pre-cast post tensioned deck slabs, parapets, sidewalks, service tunnels, waterproofing, asphalting, abutments, wing walls, approach slabs, channel dredging, and scour protection.

Temporary roads
The scope of work includes construction of temporary roads for the project which includes 150mm thick Subbase & 60mm Asphalt base course B28 for an area of 75000 Sqm.