Spotlight
Nass the Group

Durrat Al Bahrain Infrastructure

Durrat Al Bahrain Infrastructure

The Joint venture comprising of Nass Contracting and Burhan International was awarded the construction of Infrastructure for Phase 1 – Petal 1, Atoll 1, Atoll 2, Bridges B10 and B11 at Durrat. 

• Primary Components : Roadwork’s, HV/LV distribution, Lighting, Potable water, irrigation networks, Foul sewer, Storm drains and Telecoms. Phase 2 (Variation Order to Phase 1) : Petal 2 -3; Atoll 3 -4 ; Bridge 3 - 4 & 12 - 13.