Four Seasons Hotel, Minor Works

Work comprises of extension of 224 Nos of Piles with following activities:

•    Bulk Excavation of approx depth 5.8m including Dewatering by Well Point  
      System
•    Pile Trimming of 900mm Dia  of 2.925m  in length and 1200mm Dia in a range
      of  4.475m to 5.475m in length
•    Extension of Above piles by providing Formwork and Concrete
•    Backfilling with excavated and other suitable material
•    Installation of Hoarding and their maintenance 820LM


Major Items of Work                  Details                          Indicative Quantities
Excavation                                                                             23491    m3
Piling Trimming Works              900mm dia                     41    Nos
                                                       1200mm dia                  183    Nos
Concrete ( Pile Extension )                                                 1126    m3
Formwork                                                                                 3831    m2
Rebar                                                                                       338    MT
Installation of Hoardings                                                      820    LM

Major Equipments:
Earthworks, Crane for Handling Formwork, Rebar Cages etc…, Concreting Equipments, Dewatering Equipments.