Hidd Infrastructure

Hidd Infrastructure

The project includes all infrastructure detailed below including 360,000 m² of Asphalt paving and 101,000 m² of concrete sidewalks.

Key Features of work scope
The project includes all infrastructure detailed below including 360,000 m² of Asphalt paving and 101,000 m² of concrete sidewalks.

  • Site clearance
  • Water Distribution System
  • Earthworks
  • Water Pumping Station
  • Roads, including parking and fencing
  • Reservoir
  • Landscape/hardscape, including parking sheds
  • Elevated Water Tank
  • Guardhouse for water distribution
  • Storm drainage system (36 KM)
  • Sewage Treatment Plant
  • Blended water system (25 KM)
  • Sitework
  • Irrigation system (3 KM)
  • Blower building
  • Sanitary sewer system (18KM)
  • Operation & Maintenance building
  • Road lighting    Guardhouse (for the sewage treatment Plant)
  • Electrical distribution system (60KM)
  • Telecom distribution system (32 KM)