ASRY Basin Quay Wall

Project Details

The Contract was for the Design, Procurement and Construction of the New Arab Shipbuilding and Repair Yard (ASRY) Basin Quay Wall Project. ASRY had planned to extend their service capabilities by providing repair facilities for vessels up to 300,000 DWT

MARINE WORKS

Value: USD 81 million
Duration: Dec-2009 to July-2011
Scope of Work: The project consisted of design and constructing the Main Quay wall of 1,200m to accommodate vessels up to 300,000 DWT and a 180m Return Quay for tugs and smaller vessels up to 40,000 DWT; dredging the basin East of the Main Quay to a water depth of up to 12m and reclaiming an area West of the Main Quay for the ASRY North Development.

NASS Companies involved:
Nass Contracting, Nass Mechanical, Delmon Readymix, Delmon Precast, Nass Electrical, Nass Asphalt, Nass Commercial, Nass Sand and Ice Plant, Sarens Nass.

ASRY BASIN QUAY WALL
NORTH DEVELOPMENT PHASE 1: QUAY WALL INFRASTRUCTURE

INFRASTRUCTURE WORKS

Value: USD 46 million
Duration: July-2011 to July-2013
Scope of Work: The ASRY North Development Phase 1 Quay Wall Infrastructure Project was initiated after the ASRY Basin Quay Wall Project was completed to provide the necessary services and facilities for the yard to operate successfully.

The Infrastructure Works Contract scope comprised the procurement, supply, installation, construction, testing and commissioning of service networks, plant and complete infrastructure, inclusive of the following:

• Five electrical substations, compressed air facility, two freshwater pumping stations and reservoir, sea water intake pump house with 250m3/hr turbine pumps, generator room and three toilet blocks.
• 1500m3/day MBBR sewage treatment plant with reed beds for sludge disposal.
• Diesel storage and filling facility.
• HV and LV electrical reticulation including switch gear, transformers, frequency convertors, quay wall electrical service points, 19No x 35m high mast lights and about 40km of HV and LV cables.
• Approximately 12,600m of steel pipes for fire fighting, service water, fresh water and compressed air; approximately 50km of UPVC ducts for communication and electrical reticulation; about 3,200m of HDPE pipes for foul sewer and 1,000m of GRP pipes for storm drainage including mechanical service points along the quay wall.
• Six sewer lifting stations to feed the STP.
• Approximately 80,000m2 paved roadways.

NASS Companies involved:
Nass Contracting, Nass Mechanical, Delmon Readymix, Delmon Precast, Nass Electrical, Nass Asphalt, Nass Commercial, Nass Sand and Ice Plant, Sarens Nass.