Development of Durrat Al-Bahrain residential and tourist resort located at the southeast coast of Bahrain, covering an area of 20 sq.kms. over (13) man-made islands. The Project was awarded to a Joint Venture comprising Great Lakes Dredge & Dock Company and Nass Contracting Co.
PACKAGE 2000 DREDGING, RECLAMATION & INITIAL SHORE
Value: USD 217 million
Duration: Nov-2004 to Dec-2009
Scope of Work: Responsible for carrying out the Dredging works, Rock Revetment of 2,75 Million Ton, 3 Slipways, 6,6 kms of Quay Walls and 4,2 kms of Wave walls.
NASS Companies involved:
Nass Contracting, Nass Mechanical, Delmon Readymix, Delmon Precast, Nass Electrical, Nass Marine, Nass Asphalt, Nass Commercial, Nass Landscapes, Nass Scafform, Nass Sand and Ice Plant, Sarens Nass, BOP & NOP.
DURRAT BRIDGES
Value: USD 56 million
Duration: Sep-2005 to 20-Apr-2007
Scope of Work: The Contract comprises construction of 13 concrete bridges on the prestigious 20km2 Durrat Al Bahrain Development, to provide general vehicular access between the individual islands within the overall development with a total length of 3.5 km. 6 bridges to connect the Petals with the main Crescent and 6others will connect the Petals with the Atolls. One bridge will connect with the hotel island. Construction of walkways promenades between the island. The longest bridges are 520m, the shortest bridges are 162m and the bridge to the hotel is 373m. The width of the bridge is 14.5m and the span of the bridges are 16.2m and they rest on piles of 1.2m diameter each.
PACKAGE 2041 INFRASTRUCTURE PHASE 1
Value: USD 26 million
Duration: 28-Jun-2006 to 1-Aug- 2007
Scope of Work: Carrying out infrastructure works such as roads, substations, water supply system, telecommunications and sewerage networks to Atolls 1-4, Petals 1-3 and Mainland “A” as well primary services to Petals 4 & 5. Infrastructure work also includes utilities, footpaths, plazas, pumping stations and Irrigations Lake. Soft landscaping to Mainland “A” and park play equipment and public landscape furniture.
DURRAT GOLF COURSE & MARINA
Value: USD 40 million
Duration: 12-Apr-2008 to 31-Dec- 2009
Scope of Work: Contract comprises of Canal excavation approx. 125,000m3; Rock revetment works ±480,000MT; Quay wall construction (incl. precast yard establishment and block casting); Marine works (Toe bund rockworks required for the formation of 3x beaches); Cast insitu Crown /Wave Wall construction.